Company Profile
Company Charter
Code of Conduct
Press Room
Investor Relations
J. Ray News Magazine
Health, Safety & Environment
Library
Guest Book
Links

Project Management
Engineering
Fabrication
Marine Installation

JRM Engineering
Mentor Subsea
FloaTEC

Map

Baku
Batam Island, Indonesia
Dubai, UAE
Houston, Texas
Jakarta, Indonesia
Morgan City, Louisiana
New Orleans, Louisiana

Our Philosophy
Employment Opportunities

Site Map

CompanyServicesTechnologyProjectsLocationsHuman ResourcesContact Us Search
 
Home > Press Room

PRESS RELEASE: October 8, 2009

 

J. Ray McDermott Successfully Completes Yuri Korchagin

Installation Project for LUKOIL

 

J. Ray McDermott’s (J. Ray) Caspian subsidiary has successfully and safely completed installation of offshore facilities at the Yuri Korchagin field for OOO LUKOIL-Nizhnevolzhskneft (LUKOIL), a subsidiary of OAO LUKOIL Oil Company.

The Yuri Korchagin field is the first of the North Caspian fields in the Russian sector of the Caspian Sea to be developed by LUKOIL and brought commercially on-stream. The field development requires a number of major offshore facilities including an ice-resistant fixed processing platform (LSP-1) and adjacent living quarters (LSP-2) joined together by a 243-foot bridge. Oil from LSP-1 will be delivered to the marine transportation complex which consists of a Floating Storage Offloading system (FSO) and Single Point Mooring (SPM) via a 36 mile 12-inch oil pipeline. 

Within the contractual scope of work, J. Ray performed the transportation and installation of 14 foundation piles for LSP-1, transportation and installation of the SPM substructure weighing 1,005 tons, including five foundation piles, and the SPM deck, in addition to hook-up of the SPM deck to the substructure.

Additional work included engineering, procurement, fabrication, transportation and installation of tie-in spools connecting LSP-1 and the SPM to the 36-mile sub-sea pipeline as well as hydrostatic leak testing and flushing of the entire pipeline system. The pipeline was laid by J. Ray under a separate contract with LUKOIL in 2008; the company also successfully performed transportation and installation of the FSO, its connection to the SPM system and testing.

“We completed the installation scope of work offshore in a month and a half, and without a single lost time incident,” said Dan Houser, J. Ray McDermott’s Vice President and General Manager, Europe and Central Asia. “We are very pleased to continue to provide services to LUKOIL for the Yuri Korchagin development, strengthening our cooperation as well as our presence within the promising and dynamically growing Russian offshore market.”

Fabrication of the installation aids was performed by the company’s fabrication base at Baku Deepwater Jacket Factory named after Heydar Aliyev, a subsidiary of the State Oil Company of the Azerbaijan Republic (SOCAR), J. Ray McDermott’s long-term business partner in the Caspian. For the offshore installation work, J. Ray utilized six vessels provided by the Caspian Marine Services, Ltd., as per their agreement with another SOCAR’s subsidiary, Caspian Sea Oil Fleet.

J. Ray McDermott, S.A. and its subsidiaries provide engineering, construction, procurement, installation and project management services for offshore oil and gas developments worldwide.

J. Ray McDermott, S.A. and its subsidiaries provide engineering, construction, procurement, installation and project management services for offshore oil and gas developments worldwide.

 

For more information, please contact:

Gulia Taghiyeva and Roza Badalova
McDermott Caspian Contractors, Inc. - Public Relations
Baku, Azerbaijan,  Tel: +994 12 447 4462/80, Fax: +994 12 4474460
E-mail: gtaghiyeva@mcdermott.com

Louise Denly
Director, Corporate Communications
J. Ray McDermott,
Houston, Texas 77079
Tel: 281 870 5025
E-mail: ldenly@mcdermott.com


Visit our website: www.jraymcdermott.com